CoolIT is launching theCHx200 CDU, the world’s most compact and high performing rackmount CDU. This leading-edge system includes the redundancy features customers require and is capable of cooling up to 200kW of IT heat load while occupying only 4U of rack space. CoolIT’s focus on...
Check that all doors and windows of the equipment room are closed to reduce the workload of the smart cooling product during system operation. Environmental Requirements Item Requirement Room door Width ≥ 1.2 m; height ≥ 2.3 m Equipment room The equipment room provides good heat insulat...
It can be used for pre-packaging, reworked when using non-adhesives, and enables thermal bonding of two substrates at room temperature.” “Oftentimes work at the nanoscale is foundational for a device that we might not see for decades,” said Qixian Wang, Ph.D. candidate. “It’s been e...
With a focus on nurturing the cooling system through the design and overall structure of incubators, heat to the system, and to calcu 翻译结果5复制译文编辑译文朗读译文返回顶部 The article mainly through to the biological incubator design, understood the incubator the principle of work and further ...
Work Roll Cooling System Design Optimisation in Presence of Uncertainty. Azene Y T,Roy R,Farrugia D,et al. Proceedings of the 19th CIRP Design Conference—Competitive Design . 2009Azene Y T,Roy R,Farrugia D,et al.Work Roll Cooling System Design Optimisation in Presence of Uncertainty....
Forced-convective cooling of citrus fruit Package designSolomon Workneh FantaMetadel K AberaWondwosen A Aregawi
Check that all doors and windows of the equipment room are closed to reduce the workload of the smart cooling product during system operation. Environmental Requirements Item Requirement Room door Width ≥ 1.2 m; height ≥ 2.3 m Equipment room The equipment room provides good heat insulati...
Tianjin Key Laboratory for Advanced Mechatronic System Design and Intelligent Control, School of Mechanical Engineering, Tianjin University of Technology, Tianjin 300384, China 2 National Demonstration Center for Experimental Mechanical and Electrical Engineering Education, Tianjin University of Technology, Tianji...
the optimal operating temperature is in the range of 25 to 40 °C with a maximum temperature difference among battery cells of 5 °C. This work aimed to optimize lithium-ion battery packing design for electric vehicles to meet the optimal operating temperature using an air-cooling system by mo...
Work roll cooling system design optimisation in presence of uncertainty and constrains. J Manuf Sci Tech. 2010;2:290-298. http://dx.doi.org/10.1016/j. cirpj.2010.06.001Y.T. Azene,R. Roy.Work Roll Cooling System Design Optimisation in Presence of Uncertainty. Journal of Manufacturing ...