“When it came time to show my contractor my design, the only change I had to make was moving the hot water heater into a contained closet. “To my surprise and delight, my contractor took my 2D print out from Home Designer and also drew a quick sketch of what the current room looked...
The next steps in building our new shower room upstairs involved putting in place the structure of the bathroom. We installed a new vapor barrier, had a window put in, and built the partition walls. We even did some of these things two or three timesbecause it was so much fun the first...