CONCRETE CONSTRUCTION JOINT METHOD AND CONSTRUCTION JOINT CONCRETEPURPOSE: To enable the concrete construction joint suitably without eliminating laitances on the construction joint surfaces-of concretes.MOTOYAMA ATSUSHI本山 厚
摘要: PROBLEM TO BE SOLVED: To eliminate the possibility of leakage and passage of water from a curved part when the curved part is provided in a surface area by enabling cross-section chipping members to be easily installed at the curved part....
网络混凝土施工缝 网络释义 1. 混凝土施工缝 混凝土施工缝(concrete construction joint)先后浇筑的混凝土,其间歇时间超过混凝土凝结时间所形成的接缝。 www.chinabaike.com|基于 1 个网页
Joint Construction and Seismic Performance of Concrete-Filled Fiber Reinforced Polymer Tubes. (Under the direction of Amir Mirmiran) Extensive studies in the past decade have shown superior performance of concretefilled fiber reinforced polymer (FRP) tube (CFFT) under axial compression, as the system...
PURPOSE: To increase the workability, the transferring ability of shearing force, and the reliability, by netted reinforcing rods arranged on the construction joint face of the prior concrete body, anchor plates firmly fixed at the protruded end of shear-connector rods, or foamed resin plates arran...
Mechanical behavior of a new type of reinforced concrete composite slab with a joint Feng Lou, Xiulong Chen, Bin Luo, Zhong Chen Article e02773 View PDF Article preview select article Experimental and numerical study of road-bridge link slabs in fully jointless bridges using rubberized engineered...
0.1 concrete structure construction site quality management should have corresponding construction technical standards, sound quality management system, construction quality control and quality inspection system. The quality management of concrete structure construction site shall have corresponding construction techni...
According to the constitution, the execution from openings of the insides of the spaces 7 can be made, so that the width of the excavated ditch is not necessary to be wide, construction costs and a construction period can be reduced, and the execution can be made in close proximity to ...
A concrete construction includes a formed concrete slab having at least one control joint formed into a surface of the slab to control the location of stress cracks as the slab cures. A control joint protective strip is removably received in the control joint and has a head portion which over...
Tutor Perini Corporation, in a joint venture with O&G Industries, has been identified as the Apparent Selected Proposer by the New York City Department of Design and Construction for the new Manhattan Jail Facility. The project scope includes design and construction of a new facility that will hav...