a这是黑夜中的那抹柔 This is in dark night that wipes the supple pupil [translate] aDetect Non-metallic Conduit in a Concrete Slab 查出非金属输送管道在一块混凝土板 [translate] 英语翻译 日语翻译 韩语翻译 德语翻译 法语翻译 俄语翻译 阿拉伯语翻译 西班牙语翻译 葡萄牙语翻译 意大利语翻译 荷兰语翻译...
the interval maintaining device of an embedded conduit in a concrete slab improves a structure of a conduit mounted hole on which the conduits are mounted, induces the concrete to easily flow into the regular intervals of the conduits embedded in the bottom when placing the reinforcing bar, preve...
formed. These boards 18 are likewise made removable from the platform, and, in conjunction with the members 16, and the side and end rails, form a plurality of independent molds, each adapted to receive the concrete or similar forming material and to form an independent tile side or slab. ...
join the materials. Couplings are generally used to connect tubing, such as electrical conduit to various other forms of electrical tubing and support structures. In some applications, electrical conduit can be arranged to extend at least partially within a floor structure, such as a concrete slab...
耐用和刚性结构: 本产品具有热收缩型,确保安全和持久的连接。高达4450N的抗破碎性和抗冲击性使其适用于各种应用。 符合安全标准: 导管符合UL 615标准,保证符合安全法规。这确保了它可以在各种环境中使用,包括工业和商业环境。 可定制和多才多艺: 可在一系列的贸易尺寸从1/2英寸到8英寸,该管道可用于各种项目,从...
about – if it’s a slab-on-grade, you also need to avoid lines buried in the soil below. GPRS Project Managers utilize both ground penetrating radar and electromagnetic (EM) locating to provide you with a 99.8%+ accurate picture of the infrastructure within and below your concrete slab. ...
词条conduit在英语»西班牙语中的译文 conduit[ˈkɒndjuɪt,美ˈkɑ:nduɪt]名词 conduit conductom 到英语_美式英语 您希望如何使用 PONS.com? 广告版的PONS 像往常一样访问PONS.com并进行广告跟踪和广告投放 接受并继续有关追踪的详细信息,请参阅数据保护信息和隐私设置。
Finally, locating a void beneath the surface of a concrete slab or immediately beneath the slab is easier to do than determining the thickness of a void. This has to do with changes in the velocity of the GPR signal and how the signal continues to propagate after it encounters a void. Th...
2) The Big 5 in Dubai ≡≡FAQ 1.What is your MOQ ? Depend on your order (different kinds of items have different MOQ ) 2. What is your delivery time ? Normally, the time of delivery duration is around 15 days 3. What is the shipping port ?
Wherein a joint between the PHC pile(100) and the slab(200) is formed by installing cap concrete on the upper part of the PHC pile(100), installing tar paper between the upper part of the cap concrete and the lower part of the slab(200) and installing a rubber pad on the outer ...