install a plywood board to the underside of the hole as a plug to prepare for filling. This can take a fair amount of time and involve climbing ladders, using power lifts and using power tools, all possible safety issues, as well as disrupting whatever might be happening on that floor....
. Use the flat side of a trowel to level the patching compound and keep it filled inside the holes. Ensure the surface over the hole, now covered with the filler, is reasonably flat and leveled. Let the compound dry for 24 hours before you can repair the rest ofthe concrete floor....
way that a protective plate 5 composed of a steel sheet 6 of about 1-3 mm in thickness and a spongy filler 7 of about 5-20 mm in thickness is arranged immediately under the cutting position of a floor board 1 and fitted to the lower surface of the board 1 with hole-in anchors 8....
The floor covered by the plastic is slightly higher than the gross internal floor area. The value is 100 m2. Therefore, the volume is 100 m2 × 5 × 10−4 m = 0.05 m3. The density of general plastic is 960 kg/m3. Therefore, mass Qdp = 0.05 m3 × 960 kg/m3 = 48 kg. From...
Modern construction is favouring the use of high strength materials which enable the use of smaller cross-sections and consequent larger usable floor spaces. These solutions possess higher slenderness values which make them more prone to instability problems. Because of this, further study needs to ...
core recovery—ratio of the length of core recovered to the length of hole drilled, usually expressed as a percentage. core test—compression test on a concrete sample cut from hardened concrete by means of a core drill. cored beam—a beam whose cross section is partially hollow or a beam ...
the pump was then elevated by some nine or so inches. While elevating it did allow me to overcome the issue of having “an undersized pump”, and over-taxing perhaps the fountain, I think it will hurt in the long run. I wonder how the pump will do with filtering the floor of the ...
visible. Remove any dust or debris from the hole so the concrete filler can properly bond to the previously poured concrete. Slightly dampen the concrete before adding the filler, then smooth the surface with a trowel. Allow the filler to completely cure (usually 24-48 hours) before moving ...
Filling your steps is the next task, depending on the size of the scuffs or cracks you will need to use exterior filler or a cement mix. If the hole is bigger than 1″ then you must use the cement because the filler will crack if the hole is too big. ...
“Spacer Structure” generally refers to any component, part, object, device, and/or assembly that separates the top deck from an object on which the pallet rests, such as the ground, floor, other pallet, and/or other unit load. By way of nonlimiting examples, the spacer structure can ...