PROBLEM TO BE SOLVED: To provide a foundation structure having a prescribed strength and deformation performance at a low cost by placing a demolition rubbish concrete between an upper reinforced concrete and a lower reinforced concrete and by giving it rolling. SOLUTION: A lower reinforced concrete...
Advanced FRP for flooring in buildings: a low carbon material application in the construction industry research aims to investigate the CFRP floor panel, as a primary component in the floor system, to replace traditional concrete floor slab in large ... Y Gao - 《University of Portsmouth》 被...
1. Trowel concrete finish Trowel finish, known as the “smooth finish,” is the most basic level of concrete finishing. Still, these types of concrete floor finishes demand some amount of skill and precision in accomplishing a flaw-free, even, and blemish-free surface. The working process inv...
3-1C All-Weather Concrete Masonry Construction (2002) 3-2A Grouting Concrete Masonry Walls (2005) 3-3B Hybrid Concrete Masonry Construction Details (2009) 3-4C Bracing Concrete Masonry Walls Under Construction (2014) 3-5A Surface Bonded Concrete Masonry Construction (1998) 3-6C Concrete Masonry ...
Comprehensive Range of Floor Solutions - Construction & Upgrade AdvancedLaser GuidedFloor Grinding System Specialist Laser Grinding Concrete Grinding Ltd invented and manufactured the world’s most advanced laser guided floor grinding system – theLaser Grinder®which enables aisles on new and existing f...
Floor construction system with reinforced concrete edge ribs for multistory buildings comprises plate elements which are provided with concrete ribs and protrusions of steel carrier structureFloor construction system with reinforced concrete edge ribs for multistory buildings comprises plate elements which are...
Concrete Construction Wall/Floor Formwork Pipe Support Height Adjustable Acrow Post Shore Prop Tripod Stand, Find Details and Price about Scaffolding Prop Tripod Stand Acrow Prop Tripod Stand from Concrete Construction Wall/Floor Formwork Pipe Supp...
However, there are many further complexities to consider for a floor structure, not least the construction of a level top surface. Whilst it is possible in theory to design a compression only (funicular) shell geometry for a specific loading and support condition, bending forces will arise in ...
bottom of the sections of the subsidiary beams 20 to form ceiling, and a plurality of modular floor slabs 50 supported upon adjustable corner posts or stools 40, which may be electrically insulating, carried by the upper surface of the beams, to form an upper surface for the floor structure...
PROBLEM TO BE SOLVED: To contrive the reduction of an amount of steel frame and story height by eliminating the need for a stud bolt an a dowel bowel bar for integral formation with an RC-made floor, reducing a cost, arranging an upper flange in the RC-made floor slab, an calculating ...