type: [number] The optional length of the parent edge to represent phylogenetic trees. nameID Pointer to the accepted name referring to an existing Name.ID within this data package. namePhrase An optional, unrestricted, lose phrase appended to the name just for this taxon. E.g. the phrase ...
Active containers can resemble freezers, refrigerators, or even containers filled with dry ice. They allow the substances within them to be kept at a specific temperature for an indefinite length of time. On the contrary, passive packaging keeps the substances within at a specific temperature te...
The measurement of daylength is thought to be med... LC Roden,HR Song,S Jackson,... - 《Proceedings of the National Academy of Sciences of the United States of America》 被引量: 290发表: 2002年 Genetic interactions between and other flowering-time genes in Arabidopsis thaliana FLOWERING ...
The Qingming Festival falls on the first day of the Qingming solar term.清明节在清明节气的第一天。According to Han Dynasty records, The Qingming solar term happens 15 days after the Spring Equinox.根据汉代记载,清明节气在春分后的15天。During this time of the year, everything becomes clear and...
1: Whats the dimension of cold room : Length*Width*Height by Meter 2: What kind of goods will loading inside? What's the indoor temperature? 3: What's the industry voltage ? We offer the CAD documents to inform customers the positions of condensing...
From Peace (Keeping) to War: The United Nations and theWithdrawal of UNEF Should the success of a peacekeeping mission be determined by the length of time the peace is kept or by the lasting initiatives of peace that are created?... MK Carroll - 《Middle East Review of International Affair...
Combination cold room was assembled by PU panels,cold room at the same time has good air tightness and heat insulation effect. According to the requirements of use of thermal insulation and cold room panel place is different, can choose different size and the thickness of the material...
A.W have an inspection team to check the products at all stages of the production process. Q:What parameter is necessary? A.The nail diameter, nail length ect are mainly needed, detailed information would be appreciated, Spec...
A.W have an inspection team to check the products at all stages of the production process. Q:What parameter is necessary? A.The nail diameter, nail length ect are mainly needed, detailed information would be appreciated, Special requirement can be discussed. ...
Q:How long is the lead time?A:Usually for units we need 35 days to produce. If it is a special voltage of 60hz, the production time needs to be extended by 5-10 days. Panels and other things usually we need 7-20 days depends on amount.Q:What kind of te...