These charges are based on the link between capacity utilisation and the level of reactionary delay. An established method for measuring capacity utilisation was adopted called The Capacity Utilisation Index (CUI). In this paper, we propose an alternative methodology based on the theory that the ...
a500m流量 500m current capacity[translate] a降低刹车系统的使用频次,减少制动系统的磨损及轮胎因制动而增加的损耗,延长制动蹄片的更换周期 Réduit le circuit de freinage la fréquence d'utilisation, réduit le circuit de freinage l'usure et le pneu en raison de la perte qui applique le frein à...
Resource Utilization Factor = (actual hours spent by the resource)/(Total Capacity Hours)*100 For Eg: By considering, 8 Hrs/day with 22 working days for a month and 5 people worked on the projects. If 2 out of 5 people always works 2 hours extra every day, then the utilization will...
This Appendix shows the calculation methods used for: solar energy utilisation; wind energy; producing the time series ofallocated heat demand in biomass power plants; downdraught energy towers; and geothermal energy utilisation. It also shows how the time series for electricity consumption was created...
In the future the speed and capacity of the trains could be improved, which would have an impact on the projected emissions. Another assumption was that train efficiency does not change. If trains were to become much more efficient, the use phase emissions would be lower compared to embodied ...
CO2 is compressed and transported for storage back in the abandoned UCG void (6). The dotted lines in Fig. 1 represent the internal power demand of the process. The integrated power plant is a combined cycle gas turbine with an installed capacity of 308 MW and an operating efficiency of ...
A formula has been compiled, which calculates the capacity of marine macroalgae to absorb nutrients. The formula uses the C : N : P-ratio of the alga, the capability of the alga to use the incident irradiation for net carbon growth (i. e. the quantum yield for net carbon growth; alpha...
The invented method enables to adapt the size of an initial window, a loss window, and a restart window based on information available in the network to increase the utilisation of transmission capacity. ウァゲル, ステファンルドウィッグ, ライナーメイヤー, ミヒャエルイェンソン, ア...
It is also vital in meeting future demand for energy utilising indigenous sources. Livestock farming is an important economic activity in rural areas of Bangladesh. Thus, the livestock waste production, estimated biogas generation capacity, electricity generation potential, greenhouse gas (GHG) reduction...
Key performance indicators (KPIs), such as the pressure build-up and regional mass fraction of CO2, are used to constrain the injection scenarios that consequently result in the best capacity utilisation of the storage structures. In our model of fully brine saturated dome structures, based on ...