At the end of 2020, Berlin's public transport operators the BVG was finally able to close the gap in the metro network between Alexanderplatz and Brandenburger Tor in 2020. The project included closing the 2.2-kilometer gap in the line as well as building three new stations: “Rotes Rathaus...