is storedBased on the information of the building model M, the material information and the construction information, the calculation part 23 which calculates the quantity of the building material to be used for each part of the building model M andA quantity calculator 20 having aIs provided....
Manufacture, transportation, and installation of materials such as steel, concrete, and glass for construction require a large quantity of energy (Wu et al., 2014). According to Norton and Yohanis, the initial energy for manufacturing materials required for a one-story office building is ...
3b, 5). To ensure that the project is actually implemented, that is, the actual wood can support the actual construction, we first complete the calculation and statistics of the total volume and quantity of the required wood and complete the data classification (specific classification, total ...
Design controller: PID controller can calculate the control quantity according to the real-time error signal, and transfer it to the construction material packaging machinery to adjust the parameters in the packaging process to achieve the control target. (4) Risk assessment: The risk assessment mode...
Naghavi, R., Abdoli, M., Karbassi, A.R., Adl, M.: Improving the quantity and quality of biogas production in tehran anaerobic digestion power plant by application of materials recirculation technique. Int. J. Renew. Energy Dev. 9, 167–175 (2020). https://doi.org/10.14710/ijred.9.2....
A: Industry calculation rule as below: (1) house area = exterior house length X exterior house width X floor (2) canopy area=exterior house length X 1/2 X canopy width (3) staircase area = 4.5 sqm X quantity of staircase (4) corridor area = exterior house length X corridor width (...
A: Industry calculation rule as below: (1) house area=exterior house length X exterior house width X floor (2) canopy area=exterior house length X 1/2 X canopy width (3) staircase area=4.5 sqm X quantity of staircase (4) corridor area=exterior house length X...
A: Industry calculation rule as below: (1) house area=exterior house length X exterior house width X floor (2) canopy area=exterior house length X 1/2 X canopy width (3) staircase area=4.5 sqm X quantity of staircase (4) corridor area=exterior house length ...
The results show that transportation and material energy, associated with Plant I, are slightly higher than Plant II. This variation is mainly because of two reasons: (1) the transit distance between raw material source and the site was different for each plant; (2) quantity of materials used...
A: Industry calculation rule as below: (1) house area=exterior house length X exterior house width X floor (2) canopy area=exterior house length X 1/2 X canopy width (3) staircase area=4.5 sqm X quantity of staircase (4) corridor area=exterior house length...