In order to estimate plausible MI ranges for each region and building type, each of the 384 possible function-structure-region combinations per material require a minimum pool of 30 MI value datapoints (we discuss the choice of 30 in the technical validation section). For combinations that do n...
Knowing the total cost of maintenance/improvement measures scheduled for the whole planning horizon, the manager is able to set the monthly fee (amount per m2 of useable floor area) to [Math Processing Error] (15):(15)[Math Processing Error]where [Math Processing Error] is the scale of ...
Fig. 19. Embodied carbon of concrete floor systems per m2 of covered plan area. Further significant carbon saving can be achieved by transitioning into a more efficient industrialised process. By optimising the following variables, a reduction of 27% from the baseline is possible: These procedures...
The total initial cost for the building with the above mentioned integrated technologies was only RMB 2150 per square meter, which was worth spending in China due to the climatic adaptability and the relative low cost. 展开 关键词: green building low cost technique energy efficiency integrated ...
1. Cost SavingsPrice per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process.2. Quality ControlDesigned and fabricated in-factory with strict quality control. The fabrication...
steel building cost per square footprefabricated metal building80*100 metal buildingPioneer steel buildingSteel building OntarioDiscount metal building60*100 metal building cost60*40 50*60 50*50 40*50Pre engineered steel buildingsSouthern steel buildingsCheap metal build...
China Manufacturer Low Cost Light Steel Frame Prefab Metal Warehouse Building Prefabricated Workshop Steel Structure Metal Warehouse, Large-Span High-Quality Prefabricated/Prefabricated Steel Structure Factory Warehouse Is Easy to Construct,China Prefabricat...
Production Capacity 300 Sets Per Month Product Description nsteadProduct advantages 1,Extremely fast installation, only15 mins. 2,Low cost transportation. 3,Environment protaction: no construction waste, materials can be recycled. 4,Practical, good space utiliza...
m2 Square meters m/s Meters per second m3/h Cubic meters per hour Pa Pascals W Watts % Percentage ° or deg Decimal degrees CRediT authorship contribution statement Conceptualization, J.P., M.F.I. and C.F.B.; Methodology, J.P. and C.F.B.; Software, J.P. and M.F.I.; Validatio...
Cost-conscious and non-cost conscious users need to have a different approach (Bent and Kmetty, 2017; Hyysalo, 2013). Furthermore, the significance of the “green” tools and brands are a positive catalyst to increase the awareness of occupants and reduce the use of energy (Darby et al....