ROAD CONSTRUCTION AT BOUNDARY BETWEEN STRUCTURE AND FILLINGPURPOSE: To prevent level differences and crackings in a pavement at a boundary between a structure such as a bridge block and a filling on a road. ;CONSTITUTION: Backfilling is performed at the back side of a bridge block 1 as a ...
in a state of complete confusion and disorder 彻底困惑与无序的一种状态 1. The traffic in the city center was chaotic due to the road construction. 城市中心的交通由于道路施工而混乱。 2. The party was chaotic with people dancing and shouting loudly. 派对上人们大声跳舞和喊叫,非常混乱。 3. Th...
to the construction of more equitable societies. unesdoc.unesco.org unesdoc.unesco.org 这项计划为科学界与政策界开展全面的对话做好筹备、促进和倡导工作,鼓励开发共同知识的研究与 行动,消除不同专业文化之间的隔阂,为建设更加公正和公平的社会作出切实的贡献。
road within a boundary control point specified in the permit. legco.gov.hk 為方便業界運作,第88號法律公告就發出封閉道路通行許 可證訂定條文,讓使用試車牌照的未登記車輛可在許可證所指 明的邊境管制站內的封閉路上行駛。 legco.gov.hk (a) Based on initial assessment, the capital cost of the pro...
aThe port authority of Weihai city decided to invest in the construction of Weihai市港务局在建筑决定投资[translate] aIntertwining[translate] a去哈萨克斯坦要经过新疆,并且要在新疆的港口报关 Goes to Kazakhstan to have to pass through Xinjiang, and must in Xinjiang's harbor declaration[translate] ...
ROADWAY BOUNDARY BLOCK AND ROAD STRUCTURE To provide a roadway boundary block and a road structure capable of improving precision docking to a stop easily without depending on high driving ability of a driver. A roadway boundary block 100 includes an upper portion 120 arranged t... Y Shinichiro...
New Construction 1/47 Pending $469,000 Estimated mortgage PaymentEst. $2,647/moper month. Click to open monthly payment calculator modal 3bed 2bath 1,732sqft1,732 square feet 0.55acre lot0.55 acre lot 788 Boundaryline Dr NW, Calabash, NC 28467 Property type Single family On Realtor.com...
Click on the subway route to see step by step directions with maps, line arrival times and updated time schedules. Bus stops near 界限街 Boundary Street in 九龍 Kowloon City 界限街, 近書院道 Boundary Street, Near College Road, 1 min walk, ...
prices for the design and construction of boundary-crossing facilities for SWC under the “co-location” arrangement. legco.gov.hk 建築署署長建議把 9GB 號工程計劃的一部分提升為甲級;按付款 當日價格計算,估計所需費用為 25 億 100 萬元,用以設計和建造過境設施,以 便在西部通道的新口岸實行「一地兩...
[...]management skills is especially important given the scale of the project, technical complications of the works anticipated and the high level of coordination between the three governments required for taking forward the construction of thismegacross-boundaryproject. ...