BORED PRECAST PILE CONSTRUCTION METHOD AND SOLDIER PILE USED THEREFORPROBLEM TO BE SOLVED: To construct a single strong wall which is constituted of an entire column row wall.HASHIMOTO AKIFUMI橋本 彰文
1)bored pile construction钻孔桩施工 1.Through the drilling machine types used in a certain bored pile construction in Fuzhou,this article makes a simple introduction about the drilling machine,and chiefly discussed the problems and their causes in construction.钻孔桩施工因其具有广泛的适用性、成熟的施...
The invention relates to a construction process for a bored pile close to a flood wall through a riprap layer. A bent frame is lapped close to the side of a flood wall and erected above the flood wall to form a drilling platform, and a pile driver is placed on the bent frame for ...
Based on the construction engineering of bored cast-in-place piles of a new bridge,by using FEM simulation,the influence of surrounding soil stress and deformation under step construction condition is predicted,and the influence of steps of the construction sequence on stress deformation of adjacent ...
steels 21 each have plate projections 22 on both sides of its web at an intermediate portion of the same in parallel with its flanges, and engaging shapes 22a, 22b for engaging with ends of the other projections are formed at the ends of the projections 22, whereby a soldier pile is ...
construction of bored pile and its related problems选择语言:从 到 翻译结果1翻译结果2 翻译结果3翻译结果4翻译结果5 翻译结果1复制译文编辑译文朗读译文返回顶部 施工钻孔桩及其相关问题 翻译结果2复制译文编辑译文朗读译文返回顶部 厌烦的堆和其相关问题的建造 翻译结果3复制译文编辑译文朗读译文返回顶部 建设钻孔...
[translate] aConstruction of bored pile in foundation engineering design of Nanchang Causeway Bay Plaza 乏味堆的建筑在南昌堤道海湾广场基础工程设计 [translate] 英语翻译 日语翻译 韩语翻译 德语翻译 法语翻译 俄语翻译 阿拉伯语翻译 西班牙语翻译 葡萄牙语翻译 意大利语翻译 荷兰语翻译 瑞典语翻译 希腊语翻译 ...
Analytical solution methods are widely used in analyzing the impact of pile foundation construction on tunnels. Song et al. [1] analyzed the impact of different construction sequences of pile groups on multiple existing shield tunnels through theoretical analysis and numerical simulation methods, and ...
phenomenon between two adjacent holes during the construction of the bored pile of the number 17 pier of the grand bridge over Jiya river tunnel,it analysis the causation,and put forward the countermeasures so as to improve the technology of bored pile construction and save construction experience....
The Construction Technology for Large Diameter Deep Bored Pile of West Tower Foundation of Lijin Huanghe River Bridge 来自 知网 喜欢 0 阅读量: 45 作者: LU Peng-Cheng 摘要: The Yellow River Bridge at Lijin is a double pylon cable-stayed PC bridge with a main span of 310 m. The height ...