bill of quantities Financial Acronyms Encyclopedia Wikipedia n (Surveying) a document drawn up by a quantity surveyor providing details of the prices, dimensions, etc, of the materials required to build a large structure, such as a factory ...
found in the bill of quantities resulting from an error on the part of the architectural/engineering [...] daccess-ods.un.org 如前所述,因建筑设计/工程设计咨询人出错而导 致工 程 量清 单 出 现差 异的 相关事实已提交给法律事务厅。该厅审查了咨询人承认初始估计工程量有错这一 事实,断...
athe rates and prices quoted in bid in the priced bill of quantities,(except in so far as it is otherwise provided under the contract)include all constructional plant,labor,supervision,materials,all temporary works and false works, erection,maintenance,establishment and overhead charges,profit,insura...
Here the schedule of rates orbill of quantitieshas a narrower role 这里的费率表或建筑工程清单的作用范围较窄。 MultiUn The rates are based onBill of Quantitiesgeneral unit prices and not actual invoices for specific deliveries 价格基于建筑工程清单一般单位价格,并非具体货物的实际发票。
Any item of work included in the Bill of Quantities for which no rate or price was specified shall be considered as included in other rates and prices in the Bill of Quantities and will not be paid for separately. 相关知识点: 试题来源: ...
英语翻译Any item of work included in the Bill of Quantities for which no rate or price was specified shall be considered as included in other rates and prices in the Bill of Quantities and will not be paid for separately.
and prices bid in the priced Bill of Quantities,where applicable,and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract.The rates and prices of major materials (steel pipes,electromagnetic meters and valves) will be paid upon delivered to the site ...
A Bill of Quantities (BoQ) is a document listing the items and quantity of work required to complete a project. It includes a description and a measure that allows the work to be priced, and it is handed over to contractors as a key element of the tender documentation. ...
prepare at the tender stage, or when there arises no need for firm bill of quantities then this form is adopted. One of its advantage is that less time is required to prepare this and also less cost is involved. Sometimes there is greater cost uncertainty which is one of its major ...