A joint venture comprising Balfour Beatty, Vinci and Systra has won a contract from High Speed 2 to manage the construction of Old Oak Common station.Old Oak Common is one of two London stations on the High Speed 2 (HS2) line.The JV will be responsible for the design, construction and ...
Managing director for the Balfour Beatty/Vinci HS2 team Peter Anderson called on the government to restore construction-specific R&D funding to ensure the supply chain can build the country's major projects pipeline as efficiently as possible. Mr Anderson told Construction News: "Necessity is the ...
机译:在9月份的糟糕表现将公司排在第9位之后,Balfour Beatty在10月份回到了月度合同表的顶部。英国营业额最大的建筑公司在本月赢得了250万英镑的工作,其中包括文职人员,以2.43亿英镑的价格击败了Vinci UK,名列第二。同时,9月份表现最好的加利福德·特里(Galliford Try)表现出色,仅预订了760万英镑的新合同,排名第...
The article reports on the possibility that a joint venture between Balfour Beatty and Carillion will win the contract involving the first phase of Transport for London's East London Line extension. The joint venture Laing O'Rourke/Amey/Vinci also competes for the contract. The main infrastructure...