10, and a dump truck was used to dispose of the milling waste [198]. At this stage, two-wheeled and one-crawler backhoes were used to remove the last remnants of the existing mat that the milling machine had disintegrated. Fig. 10 [128] shows that the resultant waste was loaded into...
What I do is get all my dump-stock materials, anything laying around the shop. Mix up plenty of it and start pumping the material on like there's no tomorrow. I can easily put 30 -40 gallons on a 3 bedroom 2000 sq.ft. house. Runs do not matter. After that I go over the roof...