Guard ™ using an auto scrubber with blue or black pads, or a mop and bucket. Shield can be applied 28 days after placement of the concrete.Surface & Air Temperature: Temperature should be between 40-80°F (10-26°C). Shield applies, dries and cures more evenly on a cool floor....
With the Ashford Formula as the backbone of the plan, this floor would not only be fixed, it would exceed all expectations. The outcome of this project was a gorgeous floor that brought in personnel from all levels of the client’s company to see the “sexy floor”. Though this client ...
water-based sealer that pene- trates concrete and masonry building materi- als, protecting, preserving and strengthening them permanently by: Curing - Ashford Formula controls hairline checking and temperature cracking on new concrete. When applied to properly placed, structurally sound freshly finished ...