If you simulate an outage by flipping the breaker in your main panel that feeds your Gateway, the system will be very confused about your power flows because your solar is flowing to the grid, not into the backup micro-grid. I really think that you should have a certified ...
The solar is integrated into the main panel, on the grid side of the gateway. I want the installer to install a second PW2 and move the AC output from the solar inverter to the backed up side of the gateway. This would be on the same bus as the current Powerwall 2 ...
A previous section of this application note described a scenario when available PV power exceeds load demand, requiring that the GT inverter is disconnected with an OutBack remote operated circuit breaker if the excess power begins to ©2013 OutBack Power Technologies, Arlington, WA 98223 Revision ...