ACO 沟渠系统说明书 ACO DRAIN ACO Construction & Building Products Commercial Trench Drains PowerDrain Leaflet Introduction to the heavy duty PowerDrain Line S100K - 4" internal width, iron edge channel S200K - 8" internal width, iron edge channel S300K - 12" internal width, iron edge ...
(minimum 2 per channel - S200K & S300K will require 3 - 4 per channel). Cut spacers to lift supports above finished level. 2. Drill two 5/8" diameter holes in the boards and spacers - width to match widgets in channel rail. 3. Using M10 - 1.5 x 120 mm bolts with ...
$200K Jonah Hex(2010) Grip $47MM $5.4MM $11MM $11MM Welcome to the Rileys(2010) Grip $42K $159K $362K Silent Reminders(2009) (Short)-Cinematographer Smoke and Mirrors(2009) (Short)-Cinematographer Alabama Moon(2009) Additional Rigging Grip ...
SW-160型转向架是继( )转向架后推出的改进型转向架,字母S代表四方,W代表( )。 查看完整题目与答案 SW-160型转向架在206KP型转向架的基础上作如下改进:牵引销由圆锥形改为( ),以减小( ); 查看完整题目与答案 CW-200K型转向架主要由构架组成、轴箱定位装置、( )、( )等组成。 查看完整题目与答案 ...
When I folded one of them under the girl’s neck, she batted at my hand and swore at me in Spanish. Literature El capitán Jackson se acomodó en el asiento mientras continuaba la discusión. Captain Jackson settled back in his chair while the discussion went on around him. Literat...
He gives me one last look, as though he’s waiting for me to back down, to chicken out. Literature Además, el señor Bradshaw era igual de severo con Jemimah, que no se acobarda ante nada. """And Mr Bradshaw was just as strict with Jemima, and she's no coward." Literatur...
Podía acobardar a los oligarcas del país hasta la sumisión y hacer que la cámara alta de la Duma se plegara a su voluntad porque su popularidad era universal y los demás elementos del gobierno, desprestigiados en su mayor parte, lo sabían. Er konnte Russlands Oligarchen derart ...
西班牙文 英文 西班牙文-英文字典 Acolnahuacatl Acolnahuacatl (deity) HeiNER - the Heidelberg Named Entity Resource 显示算法生成的翻译 将“Acolnahuácatl"自动翻译成 英文 Acolnahuatl Glosbe Translate 错误 Google Translate
the bolt to pass through the spacers, boards and into widget nut. 1. Cut boards to length to span excavated trench or form boards (minimum 2 per channel - S200K & S300K will require 3 - 4 per channel). Cut spacers to lift supports above finished level. ...
2.ii Bolting Method - PowerLok S100K, S200K, S300K, H100SK, H200SK, H300SK will require M10 - 1.5 x 120mm bolts to screw into widgets in edge rail of channel. This allows the bolt to pass through the spacers, 2 x 4’s and into widget nut. a) Cut 2 x 4’s to length to ...