a• CONTRACTOR shall insure that field junction box wiring Multi signals to PIBs are routed above ground in cable tray in accordance with the Owner Engineering specification SAES-J-902 and SAES-P-104. • 承包商保险领域接线盒接线多在缆绳盘子发信号对PIBs在地面之上寻址与所有者工程学规格SAES-J...
underground or above ground cables etc. which are salvaged during demolishing existing structures above or below ground level shall be stacked separately by the CONTRACTOR. These salvaged items shall not become the property of the CONTRACTOR. On the contrary 任何嵌入项目例如增强钢,管子,板材,地下或在...