If a second body of mass 2m is projected horizontally from the top of a tower of height 2h, it reaches the ground at a distance 2x from the foot of the tower. The horizontal velocity of the second body is : Av B2 v C√2v Dv//2Submit...
A body is projected horizontally with a velocity of 80 m/s from the top of a tower 160 m above the ground (given that g = 10 m/s2). Find (1) time of flight and (2) the range. A ball, dropped from rest, cover 2/7 o...
If your business has a logo and it probably does, include it on your blog. This is essential as logo informs the user that your blog is a part of something bigger, your business brand. Place it on the left side of your blog page because multiple studies show that namely this placement ...
A body A is thrown up vertically from the ground with a velocity v(0) and another body B is simultaneously dropped from from a height H. They meet at a height
To complete the rep, slide horizontally over to the other arm, and push-up. The farther apart your hands, the higher percentage of your bodyweight will be supported by that side of your chest/shoulder and arm (thus getting harder)!
(FA) otherwise. Punishment for FAs consisted of a mild airpuff (0.5 sec) to the upper body and a 5 sec timeout period while a black screen was projected onto the dome. Any licks during the timeout period triggered additional brief (10 ms) airpuffs. Misses and CRs were not ...
1), where it is inclined from 14° to 10° from the chest level of the Cougher up to 10 s. Closer to the Listener, however, the plume realigns horizontally as air wraps around the chest level. Top-down view shows that the lateral plume is now confined within a 20° forward wedge ...
The main collector of sand is marram grass, which is able to survive the brutal elements and a soil devoid of nutrients. It does this, in part, thanks to a rootlike structure of rhizomes, a type of stem that collects and stores nutrients while also spreading out horizontally to sprout mor...
1, a corbel arch is constructed by horizontally laying blocks and bridging the last gap with a flat block, while a true arch consists of wedge-shaped voussoirs held together by a central keystone. Though, when compared with true arching, corbeling is less efficient at transforming the ...
The acoustic study was made by a combination of a horizontally orientated elliptical transducer (ES120_4; nominal beam angles 9.2° × 4.3°) and a circular transducer (ES120_7C; nominal angle 6.4°) aimed vertically. Both transducers were operated by a SIMRAD EK 60 split-beam echosound...